Awards

West Orange High School 
Client: Clark Construction
Budget: Exceeded $5 million
Time Frame: August 2006 – November 2008
Location: Orlando, Florida

Scope: West Orange High School is an nine building, tilt-up concrete construction educational facility.The scope of work for T&T Construction
included foundations, slab on grade, slab on elevated decks, (337) multi-story tilt-up panels and cast-in-place stairs, walls and columns and tie beams. The new high school consists of (3) two-story classroom buildings that are connected by a hollow-core walkway, gymnasium, administrative building, cafeteria, auditorium and an additional building for the athletic programs. The auditorium contains the tallest panel on site which measures 50 ft. tall and 10inches thick.

2009 ABC Excellence in Construction Eagle Award Winner

Celebration C5
Client: Duke Realty
Budget: Exceeded $1.1 million
Time Frame: April 2008 – March 2009
Location:Celebration, Florida

Scope: T&T Construction’s scope of work consisted of 34,000-square-foot office building tilt-up construction: tilt panels (65 panels) foundations, slab on grade, elevated slab on deck, cast-in-place walls, columns and sidewalks. Given the complexity of these panels, several of them required multiple pick sequencing.

2009 ABC Excellence in Construction Eagle Award Winner

High School EEE – Osceola Liberty High school 
Client: Turner Construction Company
Budget: Exceeded $5 million
Time Frame: February 2006-June 2008
Location: Kissimmee, Florida

Scope: Eight tilt-up buildings including foundations, specialized slab on grade, slab on elevated decks, (180) multi-story architecturally intricate tilt-up panels, and massive cast-in-place concrete stairs. The tallest panel measured 51’2″.

2008 ABC Excellence in Construction Eagle Award Winner

Medieval Times
“We are delighted to recommend T&T Construction for an Eagle Award with the ABC organization. T&T executed the masonry scope at Medieval Times. The project was challenging and very demanding on the T&T team. Working in the vicinity of 1100 school children, with daily matinees, presented major logistical issues and special safety challenges. T&T completed the complicated double-layer reinforced masonry grand arch while consistently faced with numerous engineering design revisions. We commend the T&T team for their creativeness in prefabricating the embattlement pointed masonry caps that reduced construction time and minimized elevated work above other trades.”

John A Maze, The Whiting-Turner Contracting Company, Project Manager

Orange County Citrus Bowl
Client: Turner Construction

 Budget: Exceeded $8 million
Time Frame: February 2015 – September 2015
Location: Orlando, Florida