West Orange High School
Client: Clark Construction
Budget: Exceeded $5 million
Time Frame: August 2006 – November 2008
Location: Orlando, Florida
Scope: West Orange High School is an nine building, tilt-up concrete construction educational facility.The scope of work for T&T Construction
included foundations, slab on grade, slab on elevated decks, (337) multi-story tilt-up panels and cast-in-place stairs, walls and columns and tie beams. The new high school consists of (3) two-story classroom buildings that are connected by a hollow-core walkway, gymnasium, administrative building, cafeteria, auditorium and an additional building for the athletic programs. The auditorium contains the tallest panel on site which measures 50 ft. tall and 10inches thick.
2009 ABC Excellence in Construction Eagle Award Winner